Military
Ownership History of the NEAM Douglas
A-26C Invader (43-22499), "Reida Rae"
- November 15, 1944 -Manufactured by Douglas Aircraft Company, Tulsa, OK
and delivered to the USAAF at Hunter AAF, GA
- December 1944 To Ninth Air Force, European Theater of Operations
- December 1944 August 1945 Service with the 671st Bombardment
Squadron of the 416th Bombardment Group (Light)
- August 17, 1945 Returned to US. 487th AAF Base Unit.
Hunter Field, GA
- January 31, 1945 Transferred to 4255th AAF Base Unit,
Grenada Field, MS (storage)
- March 19, 1946 Transferred to Air Transport Command, Ferrying Division
- March 31, 1946 Transferred to 4160th AAF Base Unit (Air Materiel
Command), Hobbs AAF (storage)
- August 5, 1947 Transferred to 4135th Base Unit, Hill AFB,
Ogden, UT (ground instructional training)
- June 1, 1948 Storage
non-cocooned. Redesignated from A-26C to B26-C.
- March 1, 1949 Redesignated as Utility Transportation
Aircraft.
- March 11, 1952 Ogden
Air Materiel Area. Depot modification.
- March 27, 1952 Transferred to Far East Air
Forces (FEACOM), 6400th Air Depot Wing
- April 30, 1952 May 15, 1952 Enroute to Tachikawa, Japan.
- June 3, 1952 Transferred to 126th Bomb Wing (Light), Laon/Couvron Air
Base, France.
- February 3, 1953 Transferred to Rhein
Main AB, Germany attached to the 60th Troop Carrier Wing.
- May 24, 1953 Transferred to the 38th Bomb Wing (Light), Furstenfeldbruck
AB, Germany.
- October 12, 1954 Transferred to 7373rd Maintenance
Group, Chateauroux, France.
- October 1955 Transferred to Fairey Aviation Co., Manchester, England for contract
modification.
- July 1956
Transferred to Davis-Monthan AFB, AZ.
- August 1957 Designated as excess.
- October 1957 Dropped from inventory.
416th Bomb Group Combat Missions flow by "Reida Rae" between Feb 8, 1944 and May 1, 1945
- Mission 200 - Feb 8, 1945, Nutterden, Germany, Defended Area
- Mission 201 - Feb 9, 1945, Kempen, Germany, Communications Center
- Mission 202 - Feb 10, 1945, east of Munstereifel, Germany, Military Installations
- Mission 205 - Feb 14, 1945, Rheinbach, Germany, Ammunition Dump
- Mission 207 - Feb 19, 1945, Weisbaden, Germany, Ordnance Depot
- Mission 209 - Feb 21, 1945, Lage, Germany, Railroad Bridge
- Mission 215 - Feb 25, 1945, Norvenich, Germany, Road Junctions
- Mission 216 - Feb 26, 1945, Sindorf, Germany, Road Junctions
- Mission 217 - Feb 28, 1945, Unna, Germany, Ordnance Depot
- Mission 218 - Mar 1, 1945, Giessen, Germany, Ordnance and Supply Depot
- Mission 219 - Mar 2, 1945, Iserlohn, Germany, Warehouses
- Mission 222 - Mar 5, 1945, Marburg, Germany, Marshalling Yards
- Mission 224 - Mar 6, 1945, Opladen, Germany, Marshalling Yards
- Mission 226 - Mar 9, 1945, Butzbach, Germany, Marshalling Yards
- Mission 227 - Mar 9, 1945, Wulfen, Germany, Ammunition Dump
- Mission 230 - Mar 11, 1945, Wulfen, Germany, Ammunition Dump
- Mission 232 - Mar 12, 1945, Mummelbach, Germany, Marshalling Yards
- Mission 234 - Mar 13, 1945, Husten, Germany, Marshalling Yards
- Mission 236 - Mar 15, 1945, Pirmasens, Germany, Road Junction
- Mission 237 - Mar 17, 1945, Altenkirchen, Germany, Road Junction
- Mission 238 - Mar 17, 1945, Bad Homburg, Germany, Marshalling Yards
- Mission 239 - Mar 18, 1945, Worms, Germany, Communications Center
- Mission 240 - Mar 18, 1945, Kreuztal, Germany, Marshalling Yards
- Mission 242 - Mar 19, 1945, Nassau, Germany, Road Junction
- Mission 244 - Mar 20, 1945, Geisecke, Germany, Marshalling Yards
- Mission 246 - Mar 21, 1945, Vreden, Germany, Road Junction
- Mission 247 - Mar 22, 1945, Borken, Germany, Built Up Area and Flak Positions
- Mission 248 - Mar 22, 1945, Borken, Germany, Built Up Area
- Mission 256 - Mar 28, 1945, Ebrach, Germany, Oil Storage Depot
- Mission 261 - Apr 4, 1945, Crailsheim, Germany, Barracks
- Mission 262 - Apr 8, 1945, Munchen-Bernsdorf, Germany, Railroad Siding And Oil Storage Tanks
- Mission 263 - Apr 8, 1945, Sondershausen, Germany, Road Junction and Built Up Area
- Mission 264 - Apr 9, 1945, Amberg-Kummersbruck, Germany, Ordnance Depot
- Mission 265 - Apr 9, 1945, Saalfeld, Germany, Marshalling Yards
- Mission 275 - Apr 17, 1945, Magdenburg, Germany, Built Up Area
- Mission 280 - Apr 21, 1945, Attang-Puchheim, Germany, Marshalling Yards
- Mission 282 - Apr 25, 1945, Freilassing, Germany, Ordnance Depot
- Mission 283 - Apr 26, 1945, Plattling, Germany, Landing Grounds
- Mission 284 - May 1, 1945, Stod, Czechoslovakia, Ammunition Plant